Mullen Library freight elevator in service; Lobby elevator still undergoing repairs Posted on July 30, 2009 by Stephen Connaghan The freight elevator in the South sections of the Stacks has been returned to service. The lobby elevator is still undergoing repairs and is expected to be out of service through August 7th. Related Share this: